BOWLS PITCH

BOWLS PITCH

Tracing of the site at the end of the terrace, earthworks and embankment on 25cm of serious 0 / 31.5 and finish in quarry sand compacting by cylinder. Rest the outline and the lighting planned for the...
SETTING THE STANDARDS OF ELECTRICAL BOXES

SETTING THE STANDARDS OF ELECTRICAL BOXES

After more than 250ml of trenches, installation of new electrical networks and boxes distributed in sufficient number, implanted so as not to cross the paths with the extensions. Burial of Bengali connections. Remains the lighting of the roads, probably temporarily...